| Chester CanalChester Canal History
    1770The Chester Canal was originally planned as a rival to the Trent & Mersey Canal which was then still under
    construction. It was proposed because the traders of Chester feared that the Trent & Mersey Canal would
    steal trade away from the River Dee. It was planned that the Chester Canal would run from the River Dee in
    Chester to the Trent & Mersey Canal at Middlewich, thus providing a short cut route between the Potteries
    and Liverpool. Unlike the Trent & Mersey Canal, which was a narrow waterway, the Chester Canal was to be a
    broad (barge) canal.
 1772An act of Parliament was passed allowing a canal to be built from the River Dee in Chester to the new Trent
    & Mersey Canal at Middlewich, a branch line into Nantwich was also to be built.
 Work continued over the next few years but engineering troubles and lack of finances caused
    many problems for the company. Work had to be stopped before the canal got anywhere near to Middlewich though
    the branch line to Nantwich was completed and connected to the finished portion of the main line. Arguments
    with the River Dee Company over delays in building a river lock in Chester cost the company dearly and any
    intended competition with the Trent & Mersey Canal was lost. (It should be noted that the Trent &
    Mersey Canal Company were never keen on the link themselves because they wanted to stay totally independent of
    any other canals or river navigations. 
 
    
        
            
                
                    
                        
                            
                                
                                    1779The Chester to Nantwich line officially opened and for 8 years the route saw a
                                    moderate amount of self contained freight traffic as well as a fairly
                                    successful fast passenger service. However, this wasn't enough to keep the
                                    waterway in profit and eventually the company collapsed.
 1787The Chester Canal was abandoned by the company and it soon started to become
                                    derelict.
 1790Three years after its closure, the owners of the abandoned Chester Canal saw
                                    the plans for a new project which would bring another canal into Chester.
 
    This was to be the Ellesmere Canal, running from the River Mersey to Chester and then on to
    Shrewsbury via Wrexham and Ruabon. The old Chester Canal company sprang into action in an effort to get their
    decaying canal back into shape. They thought the new traffic from the Mersey may well use their waterway as
    well, if enough money came in they could then complete their original line to Middlewich. 1796The new canal was completed from the Mersey to Chester, giving the Chester Canal a second outlet to add to the
    existing route via the River Dee. At this stage, the Ellesmere company were still hard at work on the rest of
    their route.
 1804Just as the Chester Canal company had done 30 years earlier, the new Ellesmere Canal company also ran into
    money troubles leaving them unable to complete their line through Wrexham and Ruabon.They were left with a 17
    mile gap from Chester to the mighty Pontcysyllte Aqueduct near Llangollen. However, the Ellesmere company's
    shortcoming gave the Chester company a chance to cash in... The Ellesmere company had already built a branch
    from its main line, near Ellesmere, to Whitchurch. The suggestion was put forward that a link should be made
    from Whitchurch to Nantwich and, when completed, this would turn the Chester Canal into an important part of a
    main line from the River Mersey to Shrewsbury. The Ellesmere company were very pleased to have found a way to
    complete their line but they were not so keen about being dependent upon the Chester company. Thus, they
    attempted to buy the whole of the Chester Canal but the Chester company held on tight and kept control of their
    waterway.
 1806The Ellesmere link was completed, joining the Chester Canal to the Ellesmere Canal at Hurleston just north of
    Nantwich. The new canal was a roaring success though the southern link to Shrewsbury was never completed.
    Instead, the Ellesmere Canal ran into numerous towns via short arms and branches. These included Whitchurch and
    Ellesmere in Shropshire, and Llangollen and Llanymynech in Wales.
 1808After working well together for a couple of years, the Chester and Ellesmere companies merged. The whole line
    from the River Mersey at Ellesmere Port through Chester to Hurleston and then on into Wales was now controlled
    by the Ellesmere & Chester Canal Company. Despite all this, the Chester Canal company's much dreamed of
    line to Middlewich was still not constructed.
 |